Site review
Assess power, placement, network path, user access, and any store or office constraints before the equipment shows up.
Staging and prep
Build, burn in, label, and prepare the environment so installation time on site stays efficient.
Install and configure
Handle rack placement, tower placement, wiring, connectivity, workstation setup, and any site-side adjustments.
Turnover and support
Complete handoff, train key contacts, and tie the environment into Astrum support or ongoing GCT service if needed.
Power and UPS protection
Make electrical readiness and continuity part of the visible install story.
Structured cabling
Show the low-voltage and network-path work that makes the deployment supportable.
Rack and server room setup
Show the physical organization, labeling, and supportability side of infrastructure deployments.
Site surveys
Build a stronger pre-install story around readiness checks, scope clarity, and reduced field surprises.
Business relocations
Show how GCT supports site moves, technology relocation, and faster reactivation in the next location.
Relocation projects make the install story feel broader and more corporate.
They show that GCT can support the full movement of a business environment, not just greenfield setup.